Course Details close

Course Details

Price:
(inc GST)
$ 385
Application:Project
Level:Advanced - Resource Management
Version:2013
Duration:1 day
Location:
Level 2
80 Mount St
North Sydney
NSW 2060
Participants:Max 10
Length:9:00 to 16:30
Break Times:
(approx)
10:30 (15mins)
12:30 (1hr)
14:45 (15mins)
Course Dates: View
Course Outline: View

Project Advanced - Resource Management 2013 Course

   (4.63 out of 5)
394 Project advanced - resource management student evaluations
Location: Level 2
80 Mount St
North Sydney
NSW 2060
Break Times:
(approx)
10:30 (15mins)
12:30 (1hr)
14:45 (15mins)
Duration: 1 day Participants: Max 10
Course Length: 9:00 to 16:30 Price:
(inc GST)
$ 385
Sale Price:
(inc GST)
$

Quick links

Project Advanced -  Resource Management 2013 Course

Course Overview

Our Microsoft Project Advanced course has been created to teach students how to manage a project’s resources, scheduling and associated costs. Students who attend this course will gain a working in-depth knowledge of creating and managing project resources, scheduling recourses, managing multiple resource calendars, resource pooling across projects, manage resource conflicts and overallocations, understand and assign various types of resources as well as project resource and cost reporting.

Who Should Attend This Course

This course expands on your current knowledge of creating and managing Microsoft Project tasks a timeline using the Gantt chart. After learning how to manage the tasking aspect of a project, students typically want to expand into learning how to manage project resources and costs. This area of Microsoft Project can get complex and hard and manage however with expert guidance and tuition you can become an expert and complete a project from start to finish in a very short space of time.

Course Prerequisites

Microsoft Project Timeline and Task Management 2013 or equivalent

Course Inclusions

FREE Course Re-sit

8 months

When you book a public course at Raisng the Bar we offer you a FREE course re-sit for up to 8 months from the scheduled course date.

FREE Email Support

12 months

Free email support for up to 12 months from the scheduled course date.

Small Class Sizes

10 students

All of our courses are capped at a maximum of 10 students to maximise your learning experience.

Classroom Training

All of our courses are face to face, hands on, classroom based training delievered by .

Course Manual

Every student will receive a printed course manual with step by step instructions to use as a reference guide.

Computer Lab

No need to bring your own laptop. Our training courses are conducted in fully equipped computer labs with free Wi-Fi.

Course Certificate

Every student receives a certificate of completion at the end of course to recognise your new skills.

Course Dates

Course Date Price Add Course Qty Status
16-Mar-20 (Mon)$385.00 0
06-Apr-20 (Mon)$385.00 0
18-May-20 (Mon)$385.00 0
15-Jun-20 (Mon)$385.00 0
Computer Training Courses

Course Outline

Create a Resource Pool


  • Why use Project?
  • Course Prerequisite
  • A Note to the Trainer
  • Resource Views
  • Enter Work Resources
  • Edit the Other Fields
  • Enter Materials Resources
  • Enter Cost Resources
  • View the Resource Information

Assigning Resources


  • The Assign Resources Dialog Box
  • Assign Resources with Modified Calendars
  • Change the Calendar for a Resource
  • Assign at Less Than 100%
  • Assigning Multiple Resources to a Task
  • Assign a Resource to an Elapsed Time Task
  • Remove a Resource from a Task
  • Controlling Effort Driven Scheduling
  • Resource Driven Scheduling
  • Changing Task Types
  • Assign Materials Resources
  • Assign Cost Resources
  • Assign Resources in the Team Planner

Level Overallocated Resources


  • Identifying Overallocated Resources
  • Automated Levelling
  • The Leveling Gantt
  • Clear Automatic Levelling
  • Fix an Overallocation using Resource Driven
  • Scheduling
  • Methods of Manual Levelling
  • Locate an Underallocated Resource
  • Separate the Tasks
  • Substitute an Overallocated Resource
  • Divide Time Between the Tasks
  • Split a Task
  • Level using Team Planner
  • Split the Work in Team Planner

Resource Costs


  • Project Statistics
  • Fixed Costs for Tasks Revisited
  • Standard Rates for Resources
  • Overtime Rates for Resources
  • Cost per Use Resources
  • View the Cost for Each Resource
  • Rate Increase Partway Through the Project
  • Using Different Rates for Different Tasks
  • The Baseline
  • A More Realistic Method of Tracking
  • Enter Work Details in the Task Form

Sharing Resources


  • Create a Shared Resource Pool
  • Share the Resources to Other Projects
  • Assigning Shared Resources
  • Assigning Shared Resources with Team Planner
  • Resolve Overallocations in Shared Resource
  • Pools
  • Viewing a Master File
  • Break the Sharing

Reporting on Resources


  • Filter Tasks by Resources
  • Highlight Filters
  • Filtering Resources
  • Built-In Reports
  • Use Visual Reports - Excel Chart
  • Use Visual Reports – Visio Drawing

Need Assistance

  • Send Email
Raising the Bar
Warning Icon Information Icon

OK
1300 937 782 Contact us